Fee-only sourcing & verification · No factory commissions · Based in Jinan, Shandong +86 186 6010 5373[email protected]
Close-up of modern automation machinery in a factory in Shanghai
Sample report

What you receive: a sample comparison report

This is the structure we deliver for a factory sourcing report. All company names, numbers and findings below are invented to illustrate the format.

Shanghai. Photo: KJ Brix / Pexels

SAMPLE TEMPLATE — EXAMPLE DATA ONLY. "Supplier A/B/C", the buyer, prices and findings are fictional. This is not a real client, not a real factory and not a real result. It shows the format and the kind of checks we run.
Factory sourcing report · SAMPLE

Vented brake discs, grey iron — 6 SKUs

Prepared for: Example Buyer GmbH (fictional) · Report ref. LS-SAMPLE-001

Issued
[date]
Prepared by
Lever Sourcing, Jinan
Suppliers
3 shortlisted · 9 excluded

1. Declarations

  • Conflict of interest: None of the suppliers in this report is, or has been in the past 24 months, a marketing client of Zhidian Network. (If one were, it would be named here and we would recommend an independent audit instead of our verification.)
  • No commission: Lever Sourcing has received no payment, rebate, gift or other benefit from any supplier in this report, and will not accept any if you place an order.
  • Payment: If you order, you pay the supplier directly. Lever Sourcing never receives payment for goods.

2. Your brief (summary)

Product
Vented brake discs, 6 passenger-car references, grey cast iron (example spec HT250), anti-rust coating, individual retail box
Quantity
[e.g. 2,000 pcs per SKU per order; 4 orders per year]
Target price
[buyer's target, per pc, FOB Qingdao]
Destination
EU
Compliance
ECE R90 approval for the relevant references; material certificate per batch
Timeline
Samples in 4 weeks; first order in 10 weeks

3. Comparison example data

ItemSupplier ASupplier BSupplier C
LocationShandong (example)Shandong (example)Hebei (example)
Type (our assessment)Manufacturer: casting + machining in-houseTrading company; sources from 2 foundriesManufacturer; machining outsourced
How we checkedDesk check + on-site visitDesk checkDesk check + video tour
Unit price, FOB Qingdao$X.XX @ 2k · $X.XX @ 5k$X.XX @ 2k · $X.XX @ 5k$X.XX @ 2k · $X.XX @ 5k
MOQ300 pcs per SKU100 pcs per SKU500 pcs per SKU
Tooling / pattern costPer new reference: $[x]Included (on stock patterns only)Per new reference: $[x], refundable after [y] pcs
Samples2 pcs per SKU, $[x], 15 daysStock samples, $[x], 7 days2 pcs per SKU, $[x], 20 days
Production lead time35–40 days30 days (depends on foundry)45 days
Payment terms offered30% T/T deposit, 70% before shipmentTrade Assurance, 30/7030% T/T, 70% against B/L copy
ECE R90verified 4 of 6 referencesclaimed certificate holder is the foundry, not Bunclear application in progress
ISO 9001 / IATF 16949verified IATF 16949 (looked up)claimed ISO 9001 of foundryverified ISO 9001
Risk flagsCoating line at capacity Q1Foundry not disclosed until askedMachining sub-supplier not visited

4. Verification detail — Supplier B example data

CheckResultEvidence / note
Business licence matches quoting companyverifiedName and credit code match the record on gsxt.gov.cn
Registered scope includes manufacturingmismatchScope lists sales and import/export of auto parts only; storefront says "factory"
Insured headcount (latest annual report)unclearSingle-digit figure; consistent with a trading office, not a foundry
Abnormal operations / penaltiesverifiedNone listed
CertificatesclaimedECE R90 and ISO 9001 certificates are issued to a third-party foundry
Bank beneficiary nameverifiedMatches the licence name of Supplier B

In a real report, every supplier gets this table, with screenshots or document references in the appendix.

5. Recommendation

Shortlist A and C for samples. A is the strongest fit: verified in-house casting and machining, and the approvals it holds cover most of your references. C is a credible second source if it completes ECE R90 approval; we suggest asking for the application reference and expected date. B is a reasonable choice only if you are comfortable buying through a trader; if so, ask it to name the foundry and put that foundry's name on the contract.

6. Questions to settle before any deposit

  1. Supplier A: written confirmation of coating line capacity for your volume in Q1.
  2. Supplier C: name and location of the machining sub-supplier; agree whether we visit it.
  3. All: packing spec and carton marking photos before mass production.

7. Excluded suppliers (appendix, summarised)

9 suppliers excluded: 4 would not share a business licence; 3 could not quote the specified material; 1 had an abnormal-operations listing; 1 is a marketing client of Zhidian Network (named in a real report).

8. Limits of this report

This report records what we checked and observed on the dates stated. It is our own verification, not a certification or an accredited third-party audit, and it is not a guarantee of product quality, delivery or the supplier's future conduct. Certificates were looked up where the issuing body offers a public check; otherwise they are marked "claimed". Prices are as quoted by suppliers and may change.

Next step

Want this for your product?

Send the spec and quantity. We confirm the scope and a fixed price first.