How Chinese factory quotes are built, and how to compare them

The cheapest quote is usually the one that assumed the least. Here is what goes into a quote, and the fields to pin down before you compare prices.

Short answer. A Chinese factory quote is material, plus processing, plus overhead and margin. On top of that, five things change the price that buyers rarely specify: material grade, tolerance and finish, packing, quantity tier, and Incoterm with port. Two quotes are comparable only when all five are pinned to the same values. Until then, a lower price usually means a lower assumption, not a better factory.

How a first quote is usually produced

From the factory side, the first reply to an inquiry is a sales document. In many factories it is written by the sales team from a price list and recent orders, before an engineer has read your drawing. Its job is to keep the conversation going. So it tends to assume the factory’s default material grade, its standard finish, plain export packing and its most comfortable quantity. Then it quotes FOB from whichever port the sales team usually uses.

None of this is dishonest. But a quote written that way and one written by an engineer against your drawing are not prices for the same product.

What is inside the price

LineWhat drives itWhat to ask for in writing
MaterialGrade, weight or thickness, and the market price of steel, aluminium, copper, rubber or resin on the quote dateMaterial standard and grade (e.g. a named EN, ASTM or GB grade), net weight per piece, and whether the price is tied to a material index
ProcessingNumber of operations, machine time, scrap rate, labourProcess route: which operations are done in-house and which are subcontracted
Surface treatmentPlating, painting, coating type and thickness, salt-spray hoursTreatment spec and the test that proves it
Tooling / mouldsPattern, die or mould cost: one-off, sometimes partly refunded after a set volumeTooling cost as a separate line, who owns the tool, how long it is kept, and whether any refund applies
SamplesSetup cost of a small run, often charged and sometimes credited against the first orderSample price, lead time, and whether it is credited
Packing and markingExport carton vs retail box, inner packs, labels, pallets, your logoA packing spec, with carton marks and pallet type
Testing and documentsMaterial certificates, test reports, certificates of originWhich documents ship with each batch and who pays for them
Delivery termEXW, FOB or CIF, and which port. Inland trucking to the port is real costIncoterm plus named port, e.g. "FOB Qingdao"
Payment and validityDeposit share, currency, exchange rate, raw-material price riskPayment terms and how many days the price is valid

The five assumptions that make quotes incomparable

  1. Material grade. "Steel" or "rubber" is not a specification. The grade is usually the largest single difference between two quotes for the same drawing. When a supplier writes "equivalent", ask for the grade it actually means, and for the mill or test certificate that will prove it.
  2. Tolerance and finish. A drawing tolerance the factory cannot hold is often quoted anyway and argued about after the samples. Ask each supplier to confirm the critical dimensions it can hold, with its measuring method.
  3. Packing. Retail packaging, inner cartons and labelling can change the unit price noticeably on low-value items. Quotes on plain export cartons look cheaper and are not wrong; they are just a different product.
  4. Quantity tier. A unit price only means something next to its quantity. Ask every supplier for the same tiers (for example your trial order, your expected annual volume, and one step in between), and ask what drives the MOQ.
  5. Incoterm and port. EXW from an inland city and FOB from a port are different prices for the same goods. Pin both the term and the named port.

MOQ: real minimums and negotiating positions

A minimum order quantity is real when it comes from the process. Examples:

  • a casting pattern that only pays off over a run
  • a fabric dye lot
  • a mould changeover
  • a minimum material purchase from the mill

It is a negotiating position when it comes from the sales team’s preference. The way to tell is to ask why the MOQ is what it is. A factory with a process reason will tell you the reason, and often what a smaller run would cost instead. A higher unit price, a tooling charge or a stock material are common alternatives.

Tooling: put ownership in writing

For castings, forgings, stampings and moulded parts, the tool is often the largest single cost of a first order. Agree in writing:

  • that the tool is yours once paid
  • that it is marked as yours
  • how long the factory will store it
  • that it will not be used for anyone else’s parts
  • on what terms you can move it to another factory

A quote that hides tooling inside the unit price makes the tool hard to claim later.

A comparison layout that works

When we compare suppliers, we put every quote into the same rows. You can use the same structure yourself:

FieldSupplier ASupplier BSupplier C
Legal entity quoting (Chinese name)
Factory or trading company (evidence)
Material grade quoted
Unit price at tier 1 / 2 / 3
Tooling cost, ownership
Sample cost, lead time, credited?
Production lead time after sample approval
Packing as quoted
Incoterm and port
Payment terms, price validity
Documents and certificates included

Our sample report shows this layout filled in with invented example data. Our sourcing report (from $399 per product) does the follow-up questions until every row describes the same product.

Warning signs in a quote

  • A price well below the others with an identical specification claim and no explanation. Ask which assumption differs before you assume a better factory.
  • A supplier that won’t itemise tooling, samples or packing.
  • An Incoterm or port that changes between the first quote and the proforma invoice.
  • Very short price validity on a product without volatile raw materials, or none stated on one with them.
  • A proforma invoice issued by a different company from the one that quoted. See how to verify a supplier.

Questions we get about this

Should I always take the cheapest quote once the specs match?

Not automatically. Once the quotes describe the same product, the remaining differences are capacity, how the supplier handles problems, and who actually does each process. That is what a visit or a live video of the line tells you.

Can you negotiate prices for me?

We ask the questions that make quotes comparable and point out where a price looks out of line, and we will ask suppliers to requote on a clarified spec. You contract and pay the factory directly, and we take nothing from it, so there is no incentive for us to push a higher price.